Reference project : Gebr. van Duijn Westdorpe BV
Gebr. van Duijn wanted a second screen installation at their location in Zeeland, near Terneuzen. Of course, we can arrange that.
We took care of the installation of the drive mechanism, and all the other tasks were expertly handled by the skilled team at Gebr. van Duijn Aubergines themselves, under our supervision.
The end result? No less than 100,000 m2 of Svensson Climate Screens Luxous Light FR, a lot of energy savings, and even more control over the cultivation.
A very pleasant, intensive collaboration that we at ALWECO are very proud of. Enjoy the screen and have a great growing season!
This is also a project listed in our Reference Project Section..